Stillwater National Bank

Year: 2009
Role: Civil Engineering, Land Surveying, Construction Staking
Client: Stillwater National Bank
Partners: Business Environments; Lambert Construction
Cost: $1.65 million

For Stillwater National Bank, Keystone prepared an existing topographic survey, performed a drainage study, and facilitated construction staking.