Harrington Creek Bridge Water Line Relocation

Year: 2011-2012
Role: Civil Engineering, Land Surveying, Construction Design
Client: City of Stillwater

As part of this utility project on the south side of SH 51 at the bridge over Harrington Creek, west of Stillwater, Keystone coordinated with ODOT, completed field surveys, record drawing, and hydraulic analysis, produced a topographic survey locating and identifying all existing features, verified constructability, submitted easement acquisition documents, ODEQ engineering report, and construction plans. Keystone also provided consultation at city council meetings, pre-bid conferences and pre-construction conferences, managed the bid process, provided documentation, and ensured compliance with all agency standards.