The Canyons

Year: 2011
Role: Civil Engineering, Land Surveying, Construction Staking
Client: Kraybill Homes

Keystone performed a drainage study and managed the master planning for this nine-phase residential development. Responsibilities included the design of the preliminary and final plats, and the public water, sewer, and paving plans. The project included a 198 acre topographic survey to define the multiple creeks and ponds on site.